Maksomer
Projects / Completed Projects / Erzurum Solid Waste Management Project Construction of a New Solid Waste Landfill
Project date
:
2005-2007
Employer
:
Erzurum Metropolitan Municipality
Location
:
Erzurum
Details
:

6 ha. solid waste landfill, reverse osmosis waste water treatment plant with the capacity of 50 m /day, gas collection and flare, administrative building, storage and workshop, pump station, weighbridge, guard house, transformer building, ring road and connection roads ( 3.6 million € )

Stabag Int.-Maksomer A.Ş. undertook this contractual work, which was issued to tender in 2006 by the Erzurum Metropolitan Ministry. The shares of the companies in the Joint Venture were % 36 for Strabag Int. to cover the supply of off-shore materials and %64 for Maksomer A.Ş. to cover whole of the Landfill construction works. The work contained the construction of a solid waste landfill of 8 hectares, operation buildings and ring road was completed and put into operation in 2007. The Project had also a Reverse Osmosis Plant for treatment of Leachate coming from the landfill area. The final value of the work amounted to 5.530.569,46 Euro with the Maksomer's share of 3.424.606,33

Completed Projects (All projects)
MAKSOMER Constructıon Industry & Trade Joint Stock Company
Güniz Sokak No: 24 Kavaklıdere / Ankara / TURKEY T: +90 (312) 426 73 53 (Pbx) F: +90 (312) 426 70 30, info@maksomer.com
All rights reserved © 2011
Web Design in/ajans