6 ha. solid waste landfill, reverse osmosis waste water treatment plant with the capacity of 50 m /day, gas collection and flare, administrative building, storage and workshop, pump station, weighbridge, guard house, transformer building, ring road and connection roads ( 3.6 million € )
Stabag Int.-Maksomer A.Ş. undertook this contractual work, which was issued to tender in 2006 by the Erzurum Metropolitan Ministry. The shares of the companies in the Joint Venture were % 36 for Strabag Int. to cover the supply of off-shore materials and %64 for Maksomer A.Ş. to cover whole of the Landfill construction works. The work contained the construction of a solid waste landfill of 8 hectares, operation buildings and ring road was completed and put into operation in 2007. The Project had also a Reverse Osmosis Plant for treatment of Leachate coming from the landfill area. The final value of the work amounted to 5.530.569,46 Euro with the Maksomer's share of 3.424.606,33