Maksomer
Projects / Ongoing Projects / Construction of First Phase Malatya Solid Waste Disposal Plant
Project date
:
05.10.2011
Employer
:
Union of Municipalities of Malatya
Location
:
Malatya, Turkey
Details
:

8.874.000 TL (3.549.600 €)

Solid Waste Disposal Facility Project, will include buildings, units and structures except solid waste landfill are as follows:

  • Solid Waste Landfill lots
  • Plant Entrance (Port of Entry and Security Control Unit)
  • Waste Reception Center Building and Weighbridge
  • Administrative Building
  • Repair and Maintenance Building
  • Wheel Washing Unit
  • Infrastructure
    • i. Drinking Water System
    • ii. Waste Water and Sewage System
    • iii. Power and Lighting System
    • iv. Communication System
  • Parking
  • Fence and Planting
  • Roads
    • i. On-Site Roads
    • ii. Ways to control
    • iii. Service Roads
  • Used Battery Temporary Storage Cell
  • Surface Water Drainage System
  • Fire Extinguishing System
  • Leachate Drainage System
  • Leachate Treatment Plant
  • Compost Pilot Plant
  • Waste Transfer Station
  • Observation Wells
  • Gas Collection Wells
Ongoing Projects (All projects)
MAKSOMER Constructıon Industry & Trade Joint Stock Company
Güniz Sokak No: 24 Kavaklıdere / Ankara / TURKEY T: +90 (312) 426 73 53 (Pbx) F: +90 (312) 426 70 30, info@maksomer.com
All rights reserved © 2011
Web Design in/ajans