136 km sewerage line of concrete pipes, water lifting centers, design and construction of waste water treatment (Incl. mechanical and electrical works) ( 33.2 million TL )
Maksomer A.Ş. undertook the above contractual work in 1998, which was issued to tender by the T.R. Environment and Forest Ministry Authority for the Protection of Special Areas. The work contained mainly the construction of a sewerage system installed of approximately 136 km long sewage lines of vapor-treated concrete pipes at various diameters and a waste water treatment plant (including mechanical equipment and electrical works) at the capacity of Q = 156 lt/sec and was completed in 2003. The sewerage system was put into operation in 2005, following one year-experimental operation. The final value of the Waste Water Treatment Plant amounted to 11.540.775,91 TL based on the 2010 up-dated prices.