A typical solid waste management landfill project requires a ring road of width 5-7 m that is paved with stabilized material, a surrounding landfill area for use by dump trucks transporting solid waste, and access roads to the main road network, typically paved with asphalt.
In addition, landfill projects also require the design and construction of buildings such as operation/administration building for operation personnel, workshop and storage facilities for necessary materials and equipment maintenance, electrical transformer buildings, guard/Access buildings and (if required) composting facilities.
MAKSOMER also has extensive experience in the design and construction of such roads, buildings and facilities.